Mechanical Engineering with more than16yrs of overall experience in Basic and detailed engineering of various packages like water & waste water treatment systems, Process Chiller system, DM water, closed cooling water system, Cooling tower system, Piping engineering with project management and co-ordination system.
Major Projects
ITER (International Nuclear Fusion Research) (Current), France
This is the kind of first nuclear fusion research project at this scale. Working as project associate for cooling water section PBS at ITER. Involved working in P&IDs, specifications for pressurizers, chillers, pumps in closed cooling water system. Having an idea about seismic requirement, Safety related design requirements which are mandatory for nuclear projects.
Suez Water Technologies, Bangalore
Biogas And Solids Treatment System Kansas,USA
Review of Detail Engineering of the P&ID, Control philosophy and GA drawings of the following packages
· Desulfurization Treatment
· Gas boosting system
· Internal system cooling and high pressure filtration
· Ultrafilter Membrane stage treatment system
OBRA 2x660MW Thermal power Extension Project, UP, India
Review of Detail Engineering vendor documents for the following packages
· Water Treatment system (PT & DM)
· Waste water treatment system
· Cooling water treatment system
· Chlorination system
· Side stream filtration system
· Sewage treatment system
POSCO – 2x300MW Coal Based Power plant, Philippines
Review and Detail Engineering for the following systems
· Water (sea) treatment system (SWRO & BWRO unit)
· Service water, potable water and DM water distribution system
· Closed cooling water system
· General Service pumps package
· CTCS package
· Hazop study for the water system packages
Samsung C&T – 2x1300MW CCPP (Combined Cycle), Algeria
Detail Engineering for the following systems
· Waste water transfer system,
· Service water system,
· Potable water system,
· Closed cooling water system (GT, ST&BOP)
· DM water distribution system
· General Service pumps
· SIL study for all water system packages.
Bara – 3x660MW Thermal power plant, Uttar Pradesh
Review and Detail Engineering for the following systems
· Water Treatment Plant package
· Fire protection system
· General Service Pumps
BECL – 2x250MW Lignite based Thermal power plant, Uttar Pradesh
Review and Detail Engineering for the Following systems
· Fire protection system
· Raw water intake system (Vertical wet pit type pumps)
· Pump house design for vertical and Horizontal pump categories
· Performance Guarantee test procedure for Vertical turbine pumps at Jyoti Ltd, Vadodra
Project: Binani Cements Power Limited, Gujarat - 1x55MW
Scope : Steam and Water Piping
Engineering management & package lead experienced in execution of various owners and EPC Thermal power projects
Project engineering experience with basic and detail engineering activities for Balance of Plant systems and equipment
Lead to handle the team for various packages until the completion in collaboration with interdepartmental and vendor support
Time and resource management for various packages more than a project
Experience of pre-bid engineering activities like formal bid review for various packages and proposal submission
More than Ten (10) years of working experience in water Treatment systems, CW Treatment & Chlorination system, SSF system, CW system, Closed cooling water system, Raw water supply and water distribution systems Worked with EPC contractor and Consulting engineers in WTP, ETP, Desalination for the capacity of treatment systems upto 150cum/hr Have worked with Korean Contractors on various country projects like Philippines, Columbia, Algeria
Over (5) years of working experience in piping engineering for power systems piping Had worked for the projects upto 150mw Executed my first project independently Possesses strong communication, leadership, problem solving, co-ordination and relationship management skills