Summary
Overview
Work History
Education
Skills
Work Availability
Timeline
Generic
TAMILSELVAN Duraisamy

TAMILSELVAN Duraisamy

Mechanical Engineer
Manosque,France

Summary

Mechanical Engineering with more than16yrs of overall experience in Basic and detailed engineering of various packages like water & waste water treatment systems, Process Chiller system, DM water, closed cooling water system, Cooling tower system, Piping engineering with project management and co-ordination system.

Overview

16
16
years of professional experience
4
4
years of post-secondary education

Work History

Associate Project Engineer in CWS Section

ITER Organization
Manosque, France
04.2021 - Current
  • CWS Section comprises a cooling water system of multiple loops for Nuclear plant cooling requirements
  • Involved in preparing specification for Equipments and whole operating system like pumps, pressurizers and chiller units
  • Bid review and Vendor document review


Senior Manager Mechanical

Tata Consulting Engineers Limtied
Bangalore, Karnataka
01.2011 - 03.2021

Major Projects

ITER (International Nuclear Fusion Research) (Current), France

This is the kind of first nuclear fusion research project at this scale. Working as project associate for cooling water section PBS at ITER. Involved working in P&IDs, specifications for pressurizers, chillers, pumps in closed cooling water system. Having an idea about seismic requirement, Safety related design requirements which are mandatory for nuclear projects.

Suez Water Technologies, Bangalore

Biogas And Solids Treatment System Kansas,USA

Review of Detail Engineering of the P&ID, Control philosophy and GA drawings of the following packages

· Desulfurization Treatment

· Gas boosting system

· Internal system cooling and high pressure filtration

· Ultrafilter Membrane stage treatment system

OBRA 2x660MW Thermal power Extension Project, UP, India

Review of Detail Engineering vendor documents for the following packages

· Water Treatment system (PT & DM)

· Waste water treatment system

· Cooling water treatment system

· Chlorination system

· Side stream filtration system

· Sewage treatment system

POSCO – 2x300MW Coal Based Power plant, Philippines

Review and Detail Engineering for the following systems

· Water (sea) treatment system (SWRO & BWRO unit)

· Service water, potable water and DM water distribution system

· Closed cooling water system

· General Service pumps package

· CTCS package

· Hazop study for the water system packages

Samsung C&T – 2x1300MW CCPP (Combined Cycle), Algeria

Detail Engineering for the following systems

· Waste water transfer system,

· Service water system,

· Potable water system,

· Closed cooling water system (GT, ST&BOP)

· DM water distribution system

· General Service pumps

· SIL study for all water system packages.

Bara – 3x660MW Thermal power plant, Uttar Pradesh

Review and Detail Engineering for the following systems

· Water Treatment Plant package

· Fire protection system

· General Service Pumps

BECL – 2x250MW Lignite based Thermal power plant, Uttar Pradesh

Review and Detail Engineering for the Following systems

· Fire protection system

· Raw water intake system (Vertical wet pit type pumps)

· Pump house design for vertical and Horizontal pump categories

· Performance Guarantee test procedure for Vertical turbine pumps at Jyoti Ltd, Vadodra

Senior Engineer, Piping

Procon Engineers
Navi Mumbai, Maharastra
04.2010 - 12.2010
  • Lead Piping Engineer responsible for the piping engineering deliverables like drawings and calculation.
  • Co-ordination with inter-departmental technical activities and discussions
  • Client co-ordination for deliverables and discussion
  • Vendor co-ordination on document submission and review engineering
  • Time and Man hour management
  • Project execution and site visit for support to construction team

Project: Binani Cements Power Limited, Gujarat - 1x55MW

Scope : Steam and Water Piping

Engineer, Piping

Aquatherm Engineering Consultants India P Limited
Chennai, Tamilnadu
10.2007 - 03.2010
  • Preparation of Piping Layout, isometrics, support drawings
  • Pipe sizing, Thickness and strength calculation
  • Preparation of Support Hanger list
  • Client meeting, Vendor meeting and Engineering review meeting
  • Involved in Bidding process and vendor drawing review
  • Supporting construction team at site and visiting site





Engineer Apprentice

Bharat Heavy Electricals Limited
Trichy, Tamilnadu
06.2006 - 06.2007
  • Learned the Basics of piping Engineering like pipe sizing and Engineering Calculation
  • Valve selection
  • Layout and isometrics drawings


Education

Bachelor of Engineering - Mechanical

Kings Engineering College
08.2001 - 06.2005

Skills

Engineering management & package lead experienced in execution of various owners and EPC Thermal power projects

undefined

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Associate Project Engineer in CWS Section

ITER Organization
04.2021 - Current

Senior Manager Mechanical

Tata Consulting Engineers Limtied
01.2011 - 03.2021

Senior Engineer, Piping

Procon Engineers
04.2010 - 12.2010

Engineer, Piping

Aquatherm Engineering Consultants India P Limited
10.2007 - 03.2010

Engineer Apprentice

Bharat Heavy Electricals Limited
06.2006 - 06.2007

Bachelor of Engineering - Mechanical

Kings Engineering College
08.2001 - 06.2005
TAMILSELVAN DuraisamyMechanical Engineer