Over than 5 years of experience in total.Including 5 years as a project manager for building construction.- Building / Civil engineering / Earthworks
The project is divided into 5 Zones (A, B, C, D and E). Each zone contains 12 Buildings, and each zone is under the responsibility of a Site Manager MOET.
Site Manager with outstanding ability to build strong relationships with clients and the company's. Strong communication in side and understanding of workplace safety procedures and policies. Dedicated to completing projects on time and under allocated budget.
Project: TNBL_SYS_ARCH_APS_MNDIS.
Project: Chartres workshop
Software used: Revit and Autocad.
SYSTRA
Direction Région France, Direction Ferroviaire et Intermodalité des Territoires FIT
HPGV SE zone E
Platform work, Market n°55200-00000035537
Client and address: SNCF Réseaux Mr. Arnaud TAILLEE SNCF Réseau – CEO IDF 10 rue Caille MOKE
93212 LA PLAINE ST DENIS
The amount of the contract for the MOE Platforms is 4M Euros. 320KM/hr LGV track
58 Platforms:
Task: MOET / Supervising TVX:
Control of documents for site monitoring and platform safety missions on the LGV + Paris / Lyon project.
Production of VS (Visit Sheets) for the MOE's rounds and the control points carried out.
Production of SPs (Stopping Points) for soil compaction control and bearing capacity tests, to ensure the compaction value requested in EV1/EV2 and compaction report.
SYSTRA
Direction Région France, Direction Ferroviaire et Intermodalité des Territoires FIT
MOE building works, works supervisor
Name of the project (Building B111 / 00080-0000001961) Project:
Train station of Ambérieu-en-Bugey France 01500
Works / Renovation and rehabilitation of the building.
Control and application of material observation sheet.
Controls modification of technical subjects on generic plans, as required.
Production of VS (Visite Sheets) for tours and regular monitoring.
Production of SP (Stopping Points) injection and waterproofing treatment of the wood frame.
Production of the OP (Observation Points) roofing, carpentry, exterior plastering general painting, floor tiling, false ceiling.
Production of PAO (Pre-Acceptance Operation) Partial acceptance with reservations, and follow-up of the reservations on the date indicated in the RPO.
Mastery: AutoCAD(Creationof2Dtechnicaldrawings) Mastery: Revit SketchUp (Creation of 3D plans) Mastery:Photoshop et GIMP
Mastery: PackOffice: Word
Mastery: Excel